Sedang
bingung menyusun rencana anggaran kebutuhan pembangunan MCK untuk Balai desa
Atau Mushallah, berikut ini saya berikan Contoh Rincian Anggaran Kebutuhuan
pembangunan MCK nya.
RINCIAN KEBUTUHAN DANA PEMBANGUNAN MCK
NO
|
JENIS KEGIATAN
|
VOL
|
SATUAN
|
HARGA
SATUAN (Rp)
|
JUMLAH
(Rp)
|
|
|
|
I
|
BAHAN
|
|
|
|
|
|
1
|
Pasir Cor
Lantai 50x50
|
10
|
Truk
|
500.000
|
5.000.000
|
|
2
|
Pasir Plaster
|
5
|
Truk
|
450.000
|
2.250.000
|
|
3
|
Koral
|
5
|
Truk
|
450.000
|
2.250.000
|
|
4
|
Batu Bata
|
15000
|
unit
|
500
|
7.500.000
|
|
5
|
Semen
|
100
|
Sak
|
52.000
|
5.200.000
|
|
7
|
Pintu
|
5
|
Unit
|
700.000
|
3.500.000
|
|
8
|
Keramik 20x25
inci
|
80
|
ktk
|
60.000
|
4.800.000
|
|
9
|
Tepung Dompol
|
60
|
Bungkus
|
12.000
|
720.000
|
|
10
|
Kayu Seumantok 4 x 4 x 16
|
24
|
Batang
|
300.000
|
7.200.000
|
|
11
|
Kayu Seumantok 2 x 3 x 16
|
24
|
Batang
|
140.000
|
3.360.000
|
|
12
|
Kayu Seumantok 2 x 4 x 16
|
100
|
Batang
|
187.000
|
18.700.000
|
|
13
|
Kayu Seumantok 2 x 2 x 16 damasui
|
100
|
Batang
|
55.000
|
5.500.000
|
|
14
|
Lesplang
|
30
|
Lembar
|
135.000
|
4.050.000
|
|
15
|
Kayu Damasui 1 1/2 x 2 x 16
|
60
|
Batang
|
40.000
|
2.400.000
|
|
16
|
Papan Damasui
|
5
|
Ton
|
6.000.000
|
30.000.000
|
|
17
|
Seng Starof 0.30 x 4T
|
47
|
Lembar
|
47.000
|
2.209.000
|
|
18
|
Rabung Starof 0.30
|
24
|
Lembar
|
25.000
|
600.000
|
|
19
|
Paku Seng 2 Inc
|
30
|
Kotak
|
15.000
|
450.000
|
|
20
|
Busa Seng
|
10
|
Bungkus
|
12.000
|
120.000
|
|
21
|
Paku 2 Inc
|
15
|
Kg
|
14.000
|
210.000
|
|
22
|
Paku 3 Inc
|
15
|
Kg
|
14.000
|
210.000
|
|
23
|
Triplek UTA 6 Inc
|
25
|
Lembar
|
78.000
|
1.950.000
|
|
24
|
Paku Triplek 1 Inc
|
10
|
Kotak
|
13.000
|
130.000
|
|
25
|
Cat CATLAX 25 Kg
|
5
|
Kaleng
|
550.000
|
2.750.000
|
|
|
Sub Total 1)
|
|
|
|
111.059.000
|
|
|
|
|
|
|
|
|
NO
|
JENIS KEGIATAN
|
JUMLAH TENAGA KERJA
|
VOLUME
|
SATUAN
|
HARGA
SATUAN
(Rp)
|
JUMLAH
(Rp)
|
|
|
|
II
|
UPAH
|
|
|
|
|
|
|
1
|
Pekerja
|
2 Orang
|
30
|
Hari
|
75.000
|
4.500.000
|
|
2
|
Tukang
|
2 Orang
|
30
|
Hari
|
75.000
|
4.500.000
|
|
3
|
Kepala Tukang
|
1 Orang
|
30
|
Hari
|
150.000
|
4.500.000
|
|
4
|
Mandor
|
1 Orang
|
30
|
Hari
|
60.000
|
1.800.000
|
|
|
Sub Total 2)
|
|
|
|
|
15.300.000
|
|
|
|
|
|
|
|
|
|
|
Jumlah
|
|
|
|
Rp.
|
126.359.000
|
|
|
Dibulatkan
|
|
|
|
Rp.
|
126.000.000
|
|
Terbilang : Seratus dua puluh enam juta rupiah
|
|
|